,

hyperTunnel reveals the world’s first underground structure built entirely by robots

by

British start-up’s ‘Peak XV’ tunnel demonstrates the potential of a radical new construction method to transform urban planning by building underground infrastructure faster, more affordably and more sustainably than current techniques.

First robot-constructed tunnel.

London, October 19th 2022 hyperTunnel, the British technology company innovating underground construction, has revealed the world’s first entirely robot-constructed underground structure, built at its RandD facility in the North Hampshire Downs.

hyperTunnel’s completely new automated construction method is designed to build tunnels more than 10 times faster and at half the cost of conventional methods. The approach is significantly friendlier to the environment and will use sustainable materials such as low-carbon concrete. Without any human needing to enter the structure during construction, the hyperTunnel method could transform safety in the tunnelling industry.

Article continues below…
Advert

Enjoy more Railways Illustrated Magazine reading every month.
Click here to subscribe & save.

Using swarm construction methods according to a digital twin of the tunnel, a fleet of ‘hyperBot’ robots enters the ground via an arch of HDPE pipes. Once inside, the robots 3D-print the tunnel shell by deploying construction material directly into the ground. The 6 metre-long, 2 metre-high and 2 metre-wide Peak XV ‘pedestrian-scale’ tunnel has been delivered as part of a project for Network Rail and revealed at the British Tunnelling Society Conference and Exhibition in London (October 11th and 12th).

Robots enter the ground via pipes.

The Network Rail project has been demonstrating the hyperTunnel process, investigating the technologies that are key to low-disruption tunnel repairs for the UK’s regional railway infrastructure, which includes approximately 650 Victorian age tunnels.

David Castlo, Network Technical Head (Mining and Tunnels) at Network Rail, said: “Our large portfolio of Victorian tunnels requires increasing levels of work to meet the needs of the railway network. However, we want to reduce the level of disruption to our passengers so we are constantly searching for new approaches to enlarging or repairing tunnels that reduce the length of time a tunnel will be closed to trains. Peak XV moves us a step closer to that goal and, crucially, with a method that reduces workforce safety risk.”

Article continues below…
Advert
hyperBot robots developed in-house.

Steve Jordan, co-CEO and co-Founder of hyperTunnel, said: “To unveil our first large scale demonstration tunnel is a big step, not only for hyperTunnel, but for the tunnelling and construction industries which are eagerly anticipating the readiness of our approach to use, as appropriate, in their global projects. While using robots exclusively to build underground structures is dramatically different, the contributing technologies, such as digital twins, robotics, 3D printing and digital underground surveying, supported by AI and VR, are all well-proven in other industries. In fact, the hyperTunnel in-situ method is all about de-risking construction projects.”

Earlier this year, hyperTunnel received funding of 1.88 million Euros from the European Innovation Council (EIC) Accelerator scheme, Europe’s flagship innovation programme. The company also received a financial investment from VINCI, a global leader in concessions, energy and construction businesses.


Advert
Subscribe to Railways Illustrated Magazine
Enjoy more Railways Illustrated Magazine reading every month. Click here to subscribe.

Railway Reads

From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.


Article Tags:

About the Author